slab on grade foundations are concrete poured directly on the ground with no space between the floor and the concrete. This occurs most frequently in areas where the ground is not freezing, and therefore likely to increase. There are derivations of this, where frost is the structure with foam insulation or hydraulic (water) heating systems integrated into the plate to prevent the land under the control of freezing. Butusually is not usually the most economically advantageous for the slab-on-grade in very cold climates. This is a guy named frost protected slab in Sweden and will accept standard here.
Die Vorteile der Tafel-on-Klasse sind, dass es ein relativ Kostengünstige Form der Wohn-Stiftung ist, sie sind sehr stabil gebaut und wenn sie richtig ausgelegt ist und hilft vom behindern Termiten Betreten des Hauses. If properly designed, offering only a few placesthe foundation of termites, which enter into the structure from below. This requires that all pipe penetrations properly sealed with stainless steel wool or caulk are such as to prevent their path. It also reduces the amount of crack perimeter, the treatment of mild infections makes the case that the termites into the house is vulnerable.
You must plan carefully in order to collect the drops of supplies by the plate for water, electricity, gas, telecommunications and allother utilities. This is often overlooked, especially because it does not take account of changes in technology.
When planning a slab-on-grade foundation, you must obtain a line from the bottom in a public place outside the waters. Most installers bury the direct line of beds or directly into the copper plate. This is not a good practice because it is expensive and difficult to repair when something goes wrong with the water line. If you have a 2 "PVC pipethe water line, a new one may be revoked if you later need. This also prevents the water line from galvanized or copper degrading from contact with the bare concrete.
The same procedure must be followed by cable and telephone. You can both services in the same line, in this case make it a 2 "pipe should be sufficient enough in this case. Electrical services to separate one on the outside of the house, so it is not usual that you must provide aHead under the covers for it. In all these cases, the line should terminate in a central location in the house, like a closet or garage.
Structural features
Invite slab-on-grade design to a depth of at least 4 "thickening to a minimum of 6" under pressure within about 16 "of the perimeter of further reinforcement steel outer wall. If there is a load-bearing interior walls, the engineer will call for this presentationArea to strengthen and thicken to compensate for these burdens.
Perimeter and interior footers footers or rafts are usually reinforced with steel bars called re-bar. This adds enormous strength to the concrete to compensate for the "real" poor tensile strength. By combining steel with concrete, you can combine two incredibly strong materials so that compensates for the characteristic weaknesses of each.
You also get what is called the WWF (welded wireTissue) as reinforcement in concrete, but his real goal is to distribute more evenly the temperature changes in concrete to prevent cracking is called, is the correct term to control cracking. I tell them not to jump, but you still have cracks in the concrete, the kind of broken concrete, so a further step to minimize the effect of cracking, is the process of placing control joints at specific time intervals, the leaks, leadership lesscrack, where you do not see and to minimize the journey of a split. If you see small cracks in the bottom of joint control, not panic, it's normal. The design and layout is very important to discuss the integrity of the plate. About this in detail with particular sub chosen so that proper control joints are located on the plate.
construction is just proper care
The key to a good-on-grade foundation, haswas designed to allow time to wet cure concrete. concrete is poured as a liquid, but begins to harden immediately. Normally it is difficult enough for a walk a day. Should not be created for at least seven days and must be done so that the temperature not too cold or too hot when you pour. The benefits of proper curing are:
Become stronger
Increased resistance to abrasion on the surface
Less permeable concrete withgreater resistance to chloride penetration and freeze / thaw damage
Greater resistance to cracking the top - to gain strength from drying plates and have a greater resistance to forces of contraction.
So what is the right method to heal. Now, running in hot climates, keep the wet concrete for at least 7 days. This is by spraying with water on the plate every day (twice a day made, if necessary) the spraying of concrete and covered with plastic sheeting forretain water into or through another medium (kept moist) like sand, straw or blankets to this feature, at least 7 days, the longer the better. With the proper planning of this will be possible, even if you use a builder, he will probably want to start framing as soon as possible cast for the cover. Do yourself a favor and allow 7 days for proper curing and ensure that appropriate methods are used to retain moisture in the pot during theTrial.
The last 2 important considerations are the temperature during the casting. Cement generates heat during the great care. If you are at very high temperatures (above 95 'F), you must make special arrangements to talk about the heat, it reduces the contractor if you suspect that you ensure this condition is to ensure that he is willing to make the right to adopt to protect the concrete to be paid. At the same time must not be poured concrete when the temperature is lower20 'F, if you are ready, heat will be stored on disk until it is completely healed. Which will be very expensive to do so, shall not be paid at best when temperatures are below freezing over a longer period. You can do it, but be sure to keep the internal temperature of the concrete not less than 55 "F.